Style group white
S icon
Local Authority
|
Folding Walls

Repton Village Hall

Repton Village Hall was opened in September 2019 becoming the second hall on the site with a sprung wooden floor in the large main hall, a community café and a meeting room.

SCROLL FOR MORE
https://style-group.co.uk/wp-content/uploads/1756/71/20190814-141833.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-141739.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-141732.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-141819.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-141751.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-142015.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-142021.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-142107.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-142103.webp https://style-group.co.uk/wp-content/uploads/1756/71/20190814-142116.webp

Products

Stylefold

Location

Repton, Derby

Village Hall Rebuild Benefits from Simple, Flexible Space

Repton Village Hall was opened in September 2019 becoming the second hall on the site with a sprung wooden floor in the large main hall, a community café and a meeting room.

The hall was built after many years of fundraising in the village, with a public works loan obtained by Repton Parish Council.

As part of a complete rebuild project, Style worked with A&S Enterprises to create flexible space in the main hall by installing a Stylefold folding wall.

The operable wall separates the main hall from a storage room making it simple to gain access to storage facilities when tables, chairs and other equipment is needed, then partitioning it off when events and gatherings are taking place.

The simple manual, E130 fire rated folding wall divides the room with ease and includes a pass door to enable simplicity of access between the main hall and storage room when the wall is in place, with the spray paint finish complementing the village hall’s modern interior design.

“This is a great example of how a relatively straightforward folding wall can make life so much easier for local people using the village hall as an important part of their community,” said Mike Fine, Style’s director for the Midlands.

“It means you can segregate off unsightly stacked tables, chairs, heaters, lights and other storage items, keeping them out of sight when the hall is in use.

“It also means, for larger events, you can maximise revenue by opening up the storage space and using as it an extension to the room, offering greater capacity and floor space.”

Style is the multi-award winning operable wall specialist and is the exclusive UK partner to DORMA Huppe, Skyfold and SWG.

As the UK market leader in moveable walls, Style’s wide-ranging portfolio caters for projects of all sizes, budgets and requirements – ranging from village halls, such as Repton, through to major projects in conference centres, hotels, businesses, hospitals, educational establishments, churches and local authority buildings.

READY TO REDEFINE THE SOUND OF YOUR SPACE?

Talk to us about your acoustic goals — we’ll help you design a solution that sounds as good as it looks. 

2026 © Style Group

Subscribe to our newsletter

Zero-Joint Technology in the Healthcare Sector

NHS England’s Health Building Note 00-09 states clinical surfaces should be “impervious, designed for easy cleaning and free of fissures and unsealed joints.”
  • Laser-bonded, adhesive-free edge, with no seam or adhesive strip
  • Designed in line with the surface characteristics HBN 00-09 describes for clinical areas
  • Formaldehyde emissions tested significantly below the EU's REACH formaldehyde limit, in effect from 6 August 2026

Why it matters

HBN 00-09 sets out these surface characteristics because unsealed joints are a recognised place for moisture and micro-organisms to collect. A genuinely joint-free edge is designed to address that specific detail.

This is a surface and edge specification, not a clinical claim. Zero-joint technology has not been evaluated or certified by NHS England, and does not claim to reduce infection rates.

Zero-Joint Technology in the Hospitality Sector

Guest-facing spaces and food-service areas face frequent hygiene inspections and heavy daily use — seamless panels help simplify housekeeping and keep finishes looking newer for longer.
  • Seamless edge finish, with no visible transition between edge and panel surface
  • 100% adhesive-free construction — no hot-melt adhesive layer to fail
  • Edge processing on all four sides, built for daily commercial use
  • Low-maintenance and easy to clean

Why it matters

Food-service and guest-facing areas are typically inspected under hygiene and housekeeping standards that look closely at surfaces and joints. A seamless, moisture-resistant edge is designed with exactly that kind of scrutiny in mind.

Every one of these sectors shares the same underlying surface problem: a bonded-strip edge is a seam, and a seam is a place where dirt, moisture or wear can concentrate in a way a continuous surface can't. Zero-joint technology addresses that one structural detail across offices, schools, healthcare and hospitality settings alike — one construction detail, one shared weak point removed, four sectors that each care about it for their own reasons.

Zero-Joint Technology in the Education Sector

Classrooms and shared facilities see high daily footfall from children and staff, so partitioning needs to withstand daily wear and support fast, thorough cleaning.
  • Seamless, adhesive-free edge with no strip to lift or wear loose over time
  • Moisture-resistant, low-maintenance surface
  • Independently tested for VOC emissions to AgBB and EN 16516

Why it matters

Schools see some of the highest footfall of any building type relative to their size, and surface durability directly affects how long fittings stay presentable between refurbishment cycles. A seam-free edge that can't lift or peel with repeated impact and cleaning is a genuinely lower-maintenance fixture over the life of the building.

Zero-Joint Technology in the Corporate Sector

Open-plan offices and meeting suites see constant daily use — surfaces need to look sharp for years without high maintenance.
  • Seamless edge finish, with no visible transition between edge and panel surface
  • 100% adhesive-free construction — no hot-melt adhesive layer to fail
  • Edge processing on all four sides, built for daily commercial use
  • Low-maintenance and easy to clean

Why it matters

An adhesive seam is one of the few places on a standard partition edge where dust, spillage residue or cleaning-product build-up can collect, simply because it isn't a flat, continuous surface. Removing that seam removes that particular weak point — a lower-maintenance fixture designed to stay looking sharp for longer.

Prefer to Write?

Fill in the form below and we’ll get back to you within one working day.

Apply Now

Fill in the form below and we’ll get back to you within one working day.

    Book a CPD with us

    Fill in the form below and we'll get back to you as quickly as we can.

    Download pdf icon

    Download

    Would you like to be contacted?