Style group white
S icon
Local Authority
|
Movable Walls

Greenwich Council

The 11th floor of 6 Mitre Passage on the Greenwich Peninsular has one of the most spectacular 360 degree vistas in London; a panorama of the O2 Arena, City Airport, The National Maritime Museum, The Thames Barrier, Canada Tower and ExCel (where Style completed Europe’s largest ever movable wall installation in 2010).

SCROLL FOR MORE
https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-1-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-10-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-2-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-11-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-9-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-8-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-7-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-4-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-3-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-6-1340px.webp https://style-group.co.uk/wp-content/uploads/1756/72/Movable-Council-Offices-Greenwich.2010-5-1340px.webp

Products

Dorma Huppe

Location

London

Architect

Sheppard Robson

Contractor

Lakehouse

VIP Installation a Meeting Room

The 11th floor of 6 Mitre Passage on the Greenwich Peninsular has one of the most spectacular 360 degree vistas in London; a panorama of the O2 Arena, City Airport, The National Maritime Museum, The Thames Barrier, Canada Tower and ExCel (where Style completed Europe’s largest ever movable wall installation in 2010).

And, with the very best meeting venues come the very highest expectations. For the movable wall Style worked with architects, Sheppard Robson, and award-winning support services provider, Lakehouse, to specify DORMA Moveo in a pure white finish. Aesthetically pleasing, as well as being outstandingly smooth to manoeuvre and operate, Moveo has the ComforTronic automatic seals as standard making it a superb semi-automatic partitioning wall.

“However, an 11th floor location that’s looking down onto the O2 arena also comes with accessibility challenges and a thorough risk assessment was needed, as well as consideration as to the best way of conducting the overall installation.”

Style decided that each element of the operable wall would have to be made so that they would fit into the service lift. Most important was that this did not affect the integrity of the final product once in situ.

Acoustic integrity, finish and ease of operation were all vital factors and once in place these were all delivered to the client’s immense satisfaction.

“We’d been advised that this was a prestigious installation due to the clientele that would be using the room, but nothing prepared us for the views,”

said Keith Way, Style’s Director for the South East.

“For any business looking for an excellent, value for money, movable wall, the semi-automatic Moveo product is growing hugely in popularity and we are seeing a significant acceleration in it’s specification,” concluded Keith. “And on this occasion it was instrumental in creating a meeting room with flexible space and truly incredible views.”

Daniel Winder of Sheppard Robson added, “This is a really excellent product and everyone involved in the project was extremely pleased with the final outcome.”

READY TO REDEFINE THE SOUND OF YOUR SPACE?

Talk to us about your acoustic goals — we’ll help you design a solution that sounds as good as it looks. 

2026 © Style Group

Subscribe to our newsletter

Zero-Joint Technology in the Healthcare Sector

NHS England’s Health Building Note 00-09 states clinical surfaces should be “impervious, designed for easy cleaning and free of fissures and unsealed joints.”
  • Laser-bonded, adhesive-free edge, with no seam or adhesive strip
  • Designed in line with the surface characteristics HBN 00-09 describes for clinical areas
  • Formaldehyde emissions tested significantly below the EU's REACH formaldehyde limit, in effect from 6 August 2026

Why it matters

HBN 00-09 sets out these surface characteristics because unsealed joints are a recognised place for moisture and micro-organisms to collect. A genuinely joint-free edge is designed to address that specific detail.

This is a surface and edge specification, not a clinical claim. Zero-joint technology has not been evaluated or certified by NHS England, and does not claim to reduce infection rates.

Zero-Joint Technology in the Hospitality Sector

Guest-facing spaces and food-service areas face frequent hygiene inspections and heavy daily use — seamless panels help simplify housekeeping and keep finishes looking newer for longer.
  • Seamless edge finish, with no visible transition between edge and panel surface
  • 100% adhesive-free construction — no hot-melt adhesive layer to fail
  • Edge processing on all four sides, built for daily commercial use
  • Low-maintenance and easy to clean

Why it matters

Food-service and guest-facing areas are typically inspected under hygiene and housekeeping standards that look closely at surfaces and joints. A seamless, moisture-resistant edge is designed with exactly that kind of scrutiny in mind.

Every one of these sectors shares the same underlying surface problem: a bonded-strip edge is a seam, and a seam is a place where dirt, moisture or wear can concentrate in a way a continuous surface can't. Zero-joint technology addresses that one structural detail across offices, schools, healthcare and hospitality settings alike — one construction detail, one shared weak point removed, four sectors that each care about it for their own reasons.

Zero-Joint Technology in the Education Sector

Classrooms and shared facilities see high daily footfall from children and staff, so partitioning needs to withstand daily wear and support fast, thorough cleaning.
  • Seamless, adhesive-free edge with no strip to lift or wear loose over time
  • Moisture-resistant, low-maintenance surface
  • Independently tested for VOC emissions to AgBB and EN 16516

Why it matters

Schools see some of the highest footfall of any building type relative to their size, and surface durability directly affects how long fittings stay presentable between refurbishment cycles. A seam-free edge that can't lift or peel with repeated impact and cleaning is a genuinely lower-maintenance fixture over the life of the building.

Zero-Joint Technology in the Corporate Sector

Open-plan offices and meeting suites see constant daily use — surfaces need to look sharp for years without high maintenance.
  • Seamless edge finish, with no visible transition between edge and panel surface
  • 100% adhesive-free construction — no hot-melt adhesive layer to fail
  • Edge processing on all four sides, built for daily commercial use
  • Low-maintenance and easy to clean

Why it matters

An adhesive seam is one of the few places on a standard partition edge where dust, spillage residue or cleaning-product build-up can collect, simply because it isn't a flat, continuous surface. Removing that seam removes that particular weak point — a lower-maintenance fixture designed to stay looking sharp for longer.

Prefer to Write?

Fill in the form below and we’ll get back to you within one working day.

Apply Now

Fill in the form below and we’ll get back to you within one working day.

    Book a CPD with us

    Fill in the form below and we'll get back to you as quickly as we can.

    Download pdf icon

    Download

    Would you like to be contacted?